CMU AXLE03

2177 unique locations - 3.5MW total capacity

TS16 (77 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
30.73 MW
TS17 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
127.86 MW
TS18 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
34.40 MW
TS19 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
21.28 MW
TS20 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
14.12 MW
TS21 (23 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
101.95 MW
TS22 (28 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
139.50 MW
TS23 (12 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
41.79 MW
TS24 (3 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
46.98 MW
TS25 (21 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
36.71 MW