Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU AXLE03

2140 unique locations - 3.5MW total capacity

YO19 (35 components)
• Domestic EV charger
• Domestic demand turn down
Inactive • 2025-26 (T-4), 2025-26 (T-1) ...
0.22 MW
YO18 (10 components)
• Domestic EV charger
• Domestic demand turn down
Inactive • 2027-28 (T-4), 2025-26 (T-1) ...
0.08 MW
YO17 (18 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive • 2025-26 (T-1), 2024-25 (T-4) ...
0.04 MW
YO16 (11 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
YO15 (14 components)

Domestic EV charger

Inactive • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
YO14 (9 components)

Domestic EV charger

Inactive • 2025-26 (T-4), 2024-25 (T-4) ...
0.00 MW
YO13 (10 components)
• Domestic EV charger
• Domestic demand turn down
Inactive • 2024-25 (T-4), 2024-25 (T-1)
0.09 MW
YO12 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
YO11 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive • 2025-26 (T-1), 2024-25 (T-4) ...
YO10 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive • 2025-26 (T-1), 2024-25 (T-4) ...
0.09 MW
Loading map...
Showing 10 locations