CMU AXLE05

662 unique locations - 34.8MW total capacity

YO61 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
64.27 MW
YO60 (11 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
36.45 MW
YO41 (28 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
110.82 MW
YO31 (17 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
29.12 MW
YO26 (43 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
104.74 MW
YO25 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
166.36 MW
YO24 (27 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
99.95 MW
YO23 (27 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
68.97 MW
YO19 (37 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
131.88 MW
YO13 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
55.97 MW
Loading map...
Showing 10 locations