Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU CES204

4 unique locations - 2.3MW total capacity

Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke RG24 8FL (2 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (14 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.44 MW
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2018-19 (T-1)
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (38 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 1.6MW Combined Heat and Power Engine
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.26 MW
Loading map...
Showing 4 locations