8 unique locations - 9.1MW total capacity

ABP Doncaster, Westmoor Park, Lincolnshire Way, Armthorpe, Doncaster DN3 3FF (25 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Component has yet to be procured.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.11 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (7 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• One of three CHP in a horticultural environment
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Component has yet to be procured
Active • 2026-27 (T-4), 2023-24 (T-1) ...
17.36 MW
EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
• 10.000MW DSR
• A gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
Fowler Welch - Site 3, W Marsh Rd, Spalding PE11 2HR, UK (23 components)
• A 10MW new build gas generating station..
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.43 MW
MMDSS - Site 1, Flathouse Quay, Portsmouth PO2 7SP (14 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2026-27 (T-4) ...
14.45 MW
MMDSS - Site 5, Flathouse Quay, Portsmouth PO2 7SP (10 components)
• A gas fuelled generating station.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2024-25 (T-1) ...
15.89 MW
Loading map...