Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU F18075

14 unique locations - 16.5MW total capacity

125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (8 components)
• Load curtailment via standby generation exporting excess
• Load reduction on-site and standby generation
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Broom Road, Stone ST15 0TE (8 components)
• Load curtailment
• Load reduction
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Bush Estate, Penicuik EH26 0QA. (3 components)
• Load reduction on site supported by non-exporting standby generation.
• Load reduction on site supported by standby generation.
Active • 2022-23 (T-4), 2021-22 (T-4)
Centre Bailey Road,Central Park, Rugby CV23 0PD (2 components)

Mix of load curtailment and standby generation

Active • 2022-23 (T-4), 2021-22 (T-4)
Combe Park, Bath, BA1 3NG (8 components)
• Standby generation taking site load
• Standby generation x 2
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.00 MW
Kings Park Road, Moulton Park, Northampton, NN3 6NW (8 components)
• Load curtailment on site and standby generation
• Load reduction on site via standby generation
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Lyndon, West Bromwich, West Midlands B71 4HJ (7 components)
• Load curtailment on site via standby generation
• Standby generation supporting load curtailment
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Monument Road, Bicker, Lincolnshire PE20 3DJ (8 components)
• Load curtailment and standby generation
• Load curtailment at site via standby generation
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Pipers Way, Swindon, Wiltshire, SN38 1SN (7 components)
• Load curtailment & standby generation
• Load reduction via on-site standby generation taking site load
Active • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 10 locations