Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU F21082

300 unique locations - 4.7MW total capacity

Asda Chesterfield, Unit 1 Sheffield Road, Chesterfield, S41 8JZ (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Chester, Greyhound Retail Park unit 33, Chester, CH1 4QQ (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Asda Clevedon, Unit 1 Tweed Road, Clevedon, BS21 6RR (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.83 MW
Asda Coalville, Ashby Road , Coalville, LE673LF (11 components)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
19.84 MW
Asda Coatbridge, Main Street, Coatbridge, ML5 3BU (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Colne, Corporation Street , Colne, BB8 8LU (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Conisbrough, Hill Top Denaby, Doncaster, DN12 4TJ (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Coseley, Daisy Street , Coseley, WV14 8QQ (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Coventry, Brade Drive, Walsgrave, CV2 2PN (11 components)
• Cottam Development Centre (CDC) CCGT single unit station
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
418.03 MW
Asda Coventry Jubilee Crescent, Jubilee Cresecnt Radford, Coventry, CV63EX (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Loading map...
Showing 10 locations