Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU LEED-1

6 unique locations - 7.0MW total capacity

Runcorn Site HQ, South Parade, PO Box9, Runcorn, Cheshire, WA7 4LT (16 components)
• 1MW / 1.15 MWH Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2026-27 (T-4) ...
113.33 MW
Pontefract Rd, Leeds, LS10 1AX (27 components)

CHP unit

Active • 2025-26 (T-4), 2025-26 (T-1) ...
31.18 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (18 components)
• Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
17.46 MW
Leeds Rd, Huddersfield HD2 1FG (1 component)

Syngenta - CHP unit

Active • 2024-25 (T-1)
7.01 MW
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (12 components)
• 4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.82 MW
Loading map...
Showing 6 locations