CMU MIN28B

2 unique locations - 24.9MW total capacity

Land adjacent Minety National Grid Substation. B4040, Nr Malmesbury, Wiltshire, SN16 9DX (4 components)
• A Battery Energy Storage System.
• A New Build Transmission Connected Battery Energy Storage System.
Active • 2028-29 (T-4)
49.72 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (3 components)
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
24.86 MW
Loading map...
Showing 2 locations