Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU PPSN23

2 unique locations - 11.1MW total capacity

Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 2h) PIVOTED POWER LLP Existing Generating CMU
Active β€’ 2025-26 (T-1), 2024-25 (T-1)
23.55 MW
Land south east of Sundon Substation, Water End Lane, Chalton, Luton, LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
47.63 MW
Loading map...
Showing 2 locations