CMU SAND-1

35 unique locations - 44.0MW total capacity

Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (5 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
6.05 MW
Church Road Woburn Sands Milton Keynes Buckinghamshire MK17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.64 MW
CONISTON ROAD BOLTON LE SANDS CARNFORTH LANCASHIRE LA5 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
COTTAGE CHARNEY ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
CRANWELL ROAD WESTON-SUPER-MARE BS24 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Huntsman Drive, Seal Sands, TS2 1TT (4 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Inactive • 2023-24 (T-1)
96.45 MW
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
KENTS BANK ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
Marston STW, MARSTON STW (LINCS), Track Off Sand Lane, Marston, GRANTHAM Lincolnshire, NG32 2HY, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.63 MW