CMU SAND-1

35 unique locations - 44.0MW total capacity

Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.63 MW
WILKIE COURT WOBURN SANDS MILTON KEYNES MK17 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.23 MW
WEATHERCOCK LANE WOBURN SANDS MILTON KEYNES BUCKINGHAMSHIRE MK17 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.64 MW
THETFORD ROAD CONEY WESTON BURY ST. EDMUNDS SUFFOLK IP31 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
The Crescent, Grange-Over-Sands, Cumbria, LA11 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
1.63 MW
STONEBECK LINDALE GRANGE-OVER-SANDS CUMBRIA LA11 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
1.63 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
55.09 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (5 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (26 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Seal Sands, Middlesborough, TS2 1UB (26 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Loading map...
Showing 10 locations