CMU SAND-1

13 unique locations - 44.0MW total capacity

Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.63 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
55.09 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (5 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (26 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Seal Sands, Middlesborough, TS2 1UB (26 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Sand Street , Pwllheli, LL53 5RT (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
1.63 MW
Marston STW, MARSTON STW (LINCS), Track Off Sand Lane, Marston, GRANTHAM Lincolnshire, NG32 2HY, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.63 MW
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Huntsman Drive, Seal Sands, TS2 1TT (4 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Inactive • 2023-24 (T-1)
96.45 MW
Loading map...
Showing 10 locations