Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

215 unique locations - 14.0MW total capacity

36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
0.26 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.32 MW
47-53 Charterhouse Street, London, EC1M 6PB (28 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.03 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (12 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.74 MW
AL6 (51 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
103.09 MW
Alex Waters Crescent Falkirk Stirlingshire FK2 (11 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.71 MW
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
0.13 MW
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (7 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.11 MW
Loading map...
Showing 10 locations