Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

19 unique locations - 14.0MW total capacity

36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Corrie Gardens, VIRGINIA WATER, SURREY, GU25 (10 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
70.00 MW
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (13 components)
• A gas CHP generator providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (4 components)

CHP at a water treatment works in Glasgow.

Inactive • 2022-23 (T-1)
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (6 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.21 MW
Grain Road Isle of Grain Rochester ME3 0AB (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
13.27 MW
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
42.00 MW
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
18.48 MW
Loading map...
Showing 10 locations