Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

36 unique locations - 14.0MW total capacity

St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• Bus depot site
• Load reduction
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.59 MW
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Component has yet to be procured.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (7 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.07 MW
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (9 components)
• 4MW of DSR
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (15 components)
• Heysham 2 Power Station CMU 7: [HY2720] T_HEYM27 + (50% x T_HEYM2-D)
• In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 6 locations