CMU WATERS

16 unique locations - 14.0MW total capacity

Asda Chorley Ringway, Water Street , Chorley, PR7 1EX (10 components)
• Load curtailment
• Load curtailment from refridgeration
• Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
28.00 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (16 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas fired reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.60 MW
Bishops Waltham, Botley Road, Bishops Waltham, SO32 1DR (5 components)
• 10 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Land at Silverwood colliery site, Hollings lane, Ravenfield, Rotherham, S65 4LQ. (4 components)
• A 20MW New Build gas fuelled generating station.
• A New Build gas fuelled generating station.
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2022-23 (T-4) ...
269.81 MW
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (7 components)
• A gas engine CHP site providing hot water to a local district heating network
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.37 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled generating station.
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
0.74 MW
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)