Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

16 unique locations - 14.0MW total capacity

Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Generating Unit 4
Inactive • 2022-23 (T-4)
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-4) ...
76.97 MW
Shingle Hall Farm, Sawbridgeworth, CM21 0LX (1 component)

A new build gas fuelled generating station. This represents 3MW of an overall 23MW capacity gas fuelled generating station. As indicated this CMU is linked to EDP114. EDP114 gained a …

Inactive • 2022-23 (T-4)
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (5 components)
• A gas engine CHP site providing hot water to agricultural greenhouses
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled generating station.
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
0.74 MW
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (7 components)
• A gas engine CHP site providing hot water to a local district heating network
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.37 MW
Loading map...
Showing 10 locations