CMU WATERS

22 unique locations - 14.0MW total capacity

Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.20 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (16 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas fired reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.60 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (6 components)
• EV charging at residential premises
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
30.46 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)
• New build power station comprised of multiple reciprocating engines.
• Peak power plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD TORQUAY TQ2 8JG (2 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2020-21 (T-1)
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (7 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU consisting of multiple reciprocating engines and alternators
• Existing generating storage battery asset with CMU ID 24GER1
Active • 2025-26 (T-1), 2023-24 (T-4) ...
26.23 MW
LAND ON THE NORTH SIDE OF COLLINS ROAD NEW ROMNEY KENT TN28 8AN (4 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 10 locations