Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

The Water Gardens HENLEY-IN-ARDEN West Midlands B95 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
THE PADDOCKS PARISH ROOM CROFT WATERS UPTON TELFORD SHROPSHIRE TF6 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
The Mount, Virginia Water, Surrey, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
THE MOORINGS BURTON WATERS LINCOLN LINCOLNSHIRE LN1 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
Thearne Lane Woodmansey Beverley HU17 0SA (4 components)
• Combination of load curtailment and standby generation
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2025-26 (T-4), 2023-24 (T-4) ...
1.13 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (4 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-4), 2021-22 (T-1)
14.00 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (2 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-4), 2021-22 (T-1)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Component has yet to be procured.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Tewkesbury Road, Cheltenham GL51 9DT , United Kingdom (9 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.72 MW
Loading map...
Showing 10 locations