Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW
M42, Water Orton, Birmingham B46 1NU (1 component)

gas fired reciprocating engines

Inactive • 2020-21 (T-4)
Lyncastle Road Battery Storage Scheme, Lyncastle Road, Appleton, Warrington, WA4 4RE. (2 components)
• A 2MW Battery Energy Storage System.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-4)
LODGE THE DRIVE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.99 MW
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.00 MW
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1)
28.00 MW
LIME TREE WALK VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
LEVENMOUTH WASTE WATER TREATMENT WORKS, 2, ELM PARK, METHILHAVEN ROAD, METHIL, LEVEN, FIFE, KY8 3WA (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
14.00 MW
Loading map...
Showing 10 locations