Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (5 components)
• A gas engine CHP site providing hot water to agricultural greenhouses
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Road off Ffordd William Morgan St Asaph LL17 0JB (2 components)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (3 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Sadds Wharf, Station Road, Maldon, Essex, CM9 4LQ (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (23 components)
• Callington - Existing Site CHP unit
• Gas fired reciprocating engines.
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.42 MW
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• 49.900MW storage installation
• The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity is nominal and allows for site-specific variations.
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (7 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-4) ...
62.91 MW
Sheldrick Way, Mildenhall, Bury Saint Edmunds IP28 7JX (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
15.47 MW
Loading map...
Showing 10 locations