CMU WATERS

301 unique locations - 14.0MW total capacity

Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (5 components)
• 1.800 MW CHP generation
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
50.00 MW
BARN WATER LANE DENSTON NEWMARKET SUFFOLK CB8 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
BARN WATER LANE RADWINTER SAFFRON WALDEN CB10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.99 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (16 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas fired reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.60 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
186.15 MW
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
Bishops Waltham, Botley Road, Bishops Waltham, SO32 1DR (5 components)
• 10 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
BLACK WATER DRIVE WIMBORNE DORSET BH21 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.99 MW
Brakes - Hemsworth, 18 Hoyle Mill Road, Kinsley, Pontefract, WF9 5EG (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.29 MW
Braunton Road Ashford Barnstaple Devon EX31 4BR (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...