Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

87 unique locations - 14.0MW total capacity

Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (3 components)
• 29MW of DSR
• A new Build Generating Storage CMU
Inactive • 2023-24 (T-4), 2020-21 (T-1)
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Water Mill Clough Oldham Lancashire OL2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
14.00 MW
Water Lane Chelveston WELLINGBOROUGH NORTHAMPTONSHIRE NN9 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
28.00 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (5 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (5 components)
• 1 x MWM TGC 2020
• Gas fire generating unit
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Component has yet to be procured.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Shingle Hall Farm, Sawbridgeworth, CM21 0LX (1 component)

A new build gas fuelled generating station. This represents 3MW of an overall 23MW capacity gas fuelled generating station. As indicated this CMU is linked to EDP114. EDP114 gained a …

Inactive • 2022-23 (T-4)
Sadds Wharf, Station Road, Maldon, Essex, CM9 4LQ (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Loading map...
Showing 10 locations