Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

KINGSCROFT DRIVE, WELTON, BROUGH, EAST RIDING OF, HU15 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.00 MW
KGV Pumping Station, East Camperdown Road, Dundee, DD1 3LG (1 component)

1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will …

Inactive • 2022-23 (T-3)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)
• New build power station comprised of multiple reciprocating engines.
• Peak power plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (7 components)
• Didcot B5 - CCGT
• Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary Infrastructure including Access Roads, Weighbridges, Fencing/Gates, Lighting, Emissions Stack, Surface Water Drainage Basins and Landscaping.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (4 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (3 components)

Hungry Snout Water Pumping Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (2 components)

Hungry Snout Water Pumping Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 10 locations