CMU WATERS

301 unique locations - 14.0MW total capacity

Honor Oak Ring Main Compound, Homestall Road, Southwark, London, United Kingdom, SE22 0SB (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
Holly Water Close, Torquay, TQ1 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
28.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• A standby diesel generator on a waste water treatment works.
• Load curtailment at site
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.00 MW
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
HEATH RISE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (13 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.91 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (5 components)
• Aggregate CMU from multiple sources
• Energy from Waste facility
• Energy from Waste facility.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
50.90 MW
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (8 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
42.00 MW
Loading map...
Showing 10 locations