Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

The Water Gardens HENLEY-IN-ARDEN West Midlands B95 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Tilbury Freeport Tilbury Essex RM18 7HE (6 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.13 MW
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (5 components)
• 1 x MWM TGC 2020
• Gas fire generating unit
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TRUMPSGREEN AVENUE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Trumpsgreen Road Virginia Water Surrey GU25 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-4) ...
76.97 MW
Tummel Power Station, Pitlochry, Perthshire, PH16 5SB (41 components)
• 1 x hydro turbine & synchronous generator
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.16 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (5 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (15 components)
• 1.89MW Battery Storage located at United Utilities Preston
• Energy from Waste facility
Active • 2026-27 (T-4), 2024-25 (T-4) ...
43.49 MW
0.92 MW
Loading map...
Showing 10 locations