Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

Grimsbury WTW, Grimsbury Green, Grimsbury, Banbury, United Kingdom, OX16 3JJ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Great Houghton HL, GT HOUGHTON HL, Leys Lane, Great Houghton, NORTHAMPTON, NN4 0AN, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Grain Road Isle of Grain Rochester ME3 0AB (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
13.27 MW
Gowanbank TWP Gowanbank Armadale Bathgate (2 components)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate (1 component)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (6 components)
• A gas engine CHP site providing hot water to a local district heating network
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
17.14 MW
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (4 components)

Glenhove Water Pumping Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Loading map...
Showing 10 locations