CMU WATERS

301 unique locations - 14.0MW total capacity

Verge by Wolverton Road, Nr Giffard Park Roundabout, Newport Pagnell, MK14 5AB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.10 MW
Verge off Hammerwood Gate, by University Roundabout, Kents Hill, MK7 6BZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.10 MW
VIEW FARM DUKES DRIVE ASHFORD-IN-THE-WATER BAKEWELL DERBYSHIRE DE45 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (4 components)
• A gas engine CHP site providing hot water to a local district heating network
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Viking Link Ltd, Bicker Fen Converter Station, Northorpe Road, Donington SPALDING PE11 4XY (3 components)
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
• Viking Link is a HVDC interconnector between GB and Danish transmission systems. Viking Link involved the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity is converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2028-29 (T-4), 2027-28 (T-4)
28.00 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Walton-on-Thames WTW, Hurst Road, , Walton-on-Thames, United Kingdom, KT12 2EG (4 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Loading map...
Showing 10 locations