301 unique locations - 14.0MW total capacity

WEST WATER CRESCENT HAMPTON VALE PETERBOROUGH CAMBRIDGESHIRE PE7 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (40 components)
• The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.
• This power plant is a series of modular integrated energy storage rack with batteries which serve as easily configurable building blocks. These racks are organized into individually managed GBS Zone subsystems which are able to be installed in standard ISO containers or in customized enclosures. There is an integrated control architecture with local user interface per battery zone, Integrated air conditioning units, fire detection and suppression system and an auxillary power distribution panel. There is an embedded DC isolation switch (per zone) with safety interlock management system. There is extensive fusing and protections at multiple levels of the system.
• West Burton A Power Station CMU 4 WA4-17= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1598.80 MW
WESSEX WATER RADIPOLE PS, RADIPOLE LANE, WEYMOUTH, DORSET, DT4 9RN (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
WESSEX WATER P/S, BUSHES ROAD, BLANDFORD, DT11 8US (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.68 MW
WELLINGTON AVENUE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
WELLINGTON AVENUE VIRGINIA WATER (JAA) GU25 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
WATER TREATMENT WORKS, WESSEX WATER LIMI, SUTTON BINGHAM, YEOVIL, SOMERSET, BA22 9QL (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
WATER TREATMENT WORKS, WARKWORTH, MORPETH, NE65 0UB (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW