Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

184 unique locations - 14.0MW total capacity

ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (2 components)
• A gas engine CHP site providing hot water to a local district heating network
• Materials recycling plant.
Active • 2026-27 (T-4), 2022-23 (T-4)
0.35 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (27 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.57 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Grimsbury WTW, Grimsbury Green, Grimsbury, Banbury, United Kingdom, OX16 3JJ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
42.00 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (5 components)
• Aggregate CMU from multiple sources
• Energy from Waste facility
• Energy from Waste facility.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
50.90 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (13 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.91 MW
HEATH RISE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
Loading map...
Showing 10 locations