Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

Water Park Road, Bideford, Devon, EX39 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
28.00 MW
WATER ORTON CLOSE TOTON NOTTINGHAM NOTTINGHAMSHIRE NG9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Water Orton, Birmingham, B46 1NU See attached location note (2 components)
• Gas fired reciprocating engines.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
Active • 2024-25 (T-4), 2021-22 (T-4)
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Water Mill Clough Oldham Lancashire OL2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
14.00 MW
Water Meadow Way Wheaton Aston Stafford Staffordshire ST19 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
WATER MEADOW WAY WENDOVER AYLESBURY HP22 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Water Meadows Worksop Nottinghamshire S80 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
WATER MEADOWS LONGRIDGE LANCASHIRE PR3 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
WATER MEADOW DRIVE DENHOLME BRADFORD BD13 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
111.99 MW
Loading map...
Showing 10 locations