Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

214 unique locations - 14.0MW total capacity

Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (13 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.91 MW
HEATH RISE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
• A standby diesel generator on a waste water treatment works.
• Load curtailment at site
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.00 MW
Holly Water Close, Torquay, TQ1 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
28.00 MW
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.00 MW
KINGSCROFT DRIVE, WELTON, BROUGH, EAST RIDING OF, HU15 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
kingsfield WINDSOR BERKSHIRE SL4 (2 components)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
Loading map...
Showing 10 locations