CMU WATERS

5 unique locations - 14.0MW total capacity

Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.20 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (6 components)
• A gas engine CHP site providing hot water to a local district heating network
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
17.14 MW
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (16 components)
• A gas engine CHP site providing hot water to an industrial unit
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.57 MW
Loading map...
Showing 5 locations