36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
56.00 MW
47-53 Charterhouse Street, London, EC1M 6PB (23 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
28.03 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.20 MW
Alex Waters Crescent Falkirk Stirlingshire FK2 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.99 MW
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
14.00 MW
Asda Chorley Ringway, Water Street , Chorley, PR7 1EX (10 components)
• Load curtailment
• Load curtailment from refridgeration
• Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
28.00 MW
BARN WATER LANE DENSTON NEWMARKET SUFFOLK CB8 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
BARN WATER LANE RADWINTER SAFFRON WALDEN CB10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.99 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (16 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas fired reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.60 MW
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
Loading map...
Showing 10 locations