CMU WATERS

18 unique locations - 14.0MW total capacity

Bishops Waltham, Botley Road, Bishops Waltham, SO32 1DR (5 components)
• 10 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)
• New build power station comprised of multiple reciprocating engines.
• Peak power plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD TORQUAY TQ2 8JG (2 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2020-21 (T-1)
LAND ON THE NORTH SIDE OF COLLINS ROAD NEW ROMNEY KENT TN28 8AN (4 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND ON THE SOUTH EAST SIDE OF WHITEGATE WHITE LUND INDUSTRIAL ESTATE MORECAMBE LA3 3DU (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Plot D, Faraday Business Park, Solent Airport, Daedalus, Lee-on-the-Solent, Hampshire, PO13 9FW (3 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• A new Build Generating Storage CMU
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Pringle Street, Blackburn, BB1 1SA (2 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.90 MW