[PARENT] Pulse Clean Energy Limited

25 unique locations (216 components) - Page 1 of 3

Active MW: 0.00 MW
Inactive MW: 0.00 MW
West Thorpe, Willoughby on the Wolds, LE12 6TD (13 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (5 components)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (3 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
Tir John North Road, St Thomas, SA1 8NS (1 component)

Gas fired reciprocating engines.

Active • 2024-25 (T-4)
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4), 2025-26 (T-4)
Pengarnddu Ind Est, Dowlais Top CF48 2TA (5 components)

Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Main Ave, Hirwaun, CF44 9UY (15 components)
• Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...