[PARENT] Pulse Clean Energy Limited
25 unique locations (216 components)
West Thorpe, Willoughby on the Wolds, LE12 6TD (13 components)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (5 components)
New build one-hour duration storage to replace diesel plant
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (3 components)
New build one-hour duration storage to replace diesel plant
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
Tir John North Road, St Thomas, SA1 8NS (1 component)
Gas fired reciprocating engines.
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)
New build one-hour duration storage to replace diesel plant
Pengarnddu Ind Est, Dowlais Top CF48 2TA (5 components)
Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to …
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
Main Ave, Hirwaun, CF44 9UY (15 components)
Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU (3 components)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
Hirwaun Industrial Estate, Main Avenue, Aberdare, Mid Glamorgan, CF44 9UY (2 components)
2-hour BESS storage asset
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)
Green Frog Power 214 STOR Generation off Roseland Road, off Titanium Road, West Glamorgan, Swansea, SA5 4SG (1 component)
Gas fired reciprocating engines.
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)
New build one-hour duration storage to replace diesel plant
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Faraday Road, Plymouth, PL4 0ST (12 components)
Faraday Road, Plymouth, PL4 0SR (2 components)
New build one-hour duration storage to replace diesel plant
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)
New build one-hour duration storage to replace diesel plant
Brunel Way, Briton Ferry, SA11 2GA (15 components)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (5 components)
AB51 (98 components)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)