Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

[PARENT] Pulse Clean Energy Limited

25 unique locations (216 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
AB51 (98 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (5 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration Battery Storage Plant.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Brunel Way, Briton Ferry, SA11 2GA (15 components)
• Gas fired reciprocating engines.
• Reciprocating engines
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4), 2025-26 (T-4)
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4), 2025-26 (T-4)
Faraday Road, Plymouth, PL4 0ST (12 components)
• Gas fired reciprocating engines.
• Reciprocating Engines
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2027-28 (T-4), 2025-26 (T-1) ...
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4), 2025-26 (T-4)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration battery storage project.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Atherton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 hour battery storage system.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU comprises lithium ion batteries and is capable of exporting the declared capacity for a duration of 2 hours.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Main Ave, Hirwaun, CF44 9UY (15 components)
• Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
Pengarnddu Ind Est, Dowlais Top CF48 2TA (5 components)

Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4), 2025-26 (T-4)
Tir John North Road, St Thomas, SA1 8NS (1 component)

Gas fired reciprocating engines.

Active • 2024-25 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (3 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (5 components)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
West Thorpe, Willoughby on the Wolds, LE12 6TD (13 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Loading map...
Showing 25 locations