[PARENT] SSE plc

15 unique locations (221 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
AB42 (111 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
Avon Close, Weston-Super-Mare, BS23 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Bridwell Road, Weston Mill, Plymouth, Devon, PL5 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Daley Close, Weston-super-Mare, Somerset, BS22 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Hillside West, Hutton, Weston-super-Mare, Somerset, BS24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Humbly Grove Energy Ltd, Weston Common, The Avenue, Lasham, The Avenue, Alton Hants, GU34 5SY (1 component)

On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)

Active • 2025-26 (T-1)
Lakeshill Road, Worcestershire, WR11 8TS (4 components)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2028-29 (T-4), 2025-26 (T-1)
Medway Power Station, Rochester, Medway, ME3 0AG (25 components)
• Medway
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Snowdon Vale, Weston-super-Mare, Somerset, BS23 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tealing Substation, Myreton Farm Cottages, Strathmartine, Dundee DD3 0PY. (24 components)
• Offshore Wind Farm with 30 Wind Turbines
• Offshore wind farm with 38 wind turbines
• Wind Farm with 16 wind turbines
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Street, Coney Weston, Bury St. Edmunds, IP31 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Weston Close, Upton Grey, Basingstoke, RG25 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Loading map...
Showing 15 locations