Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

[PARENT] SSE plc

204 unique locations (2221 components) - Page 4 of 9

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Muccomer Power Station Gairlochy SPEAN BRIDGE PH34 4EQ (1 component)

hydro genset

Active • 2027-28 (T-4)
Mossford Power Station, Loch Luichart, Near Garve, Ross-shire, IV23 2QA (2 components)

Mossford Hydro Generation Gensets 1 & 2

Active • 2028-29 (T-4), 2027-28 (T-4)
Milton Road, Weston Super Mare, Weston Super Mare, BS22 8AA (20 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR P3P Partners LLP Not Prequalified BS22
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Medway Power Station, Rochester, Medway, ME3 0AG (25 components)
• Medway
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
MEADOWS BRIDGWATER ROAD LYMPSHAM WESTON-SUPER-MARE BS24 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
MAIN STREET WESTON TURVILLE AYLESBURY BUCKINGHAMSHIRE HP22 (14 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Macfarlane Chase Weston-Super-Mare BS23 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Luichart Power Station, Contin, Strathpeffer, IV14 9EW (8 components)
• Hydro Generation Gensets 1 & 2
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
LODGE DRIVE WESTON SUPER MARE BS23 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loch Ericht, By Rannoch, PH16 (1 component)

hydro genset

Active • 2027-28 (T-4)
Lochay Power Station, Killin, Stirling, FK21 8UA (25 components)
• Genset 1.
• Genset 1. ROCable hydro units within the BMU are not included in the CMU.
• Genset 2.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..

Active • 2027-28 (T-4), 2026-27 (T-4)
LEAZE SPRING HILL WESTON-SUPER-MARE BS22 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
LAWS DRIVE WESTON-SUPER-MARE BS24 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
• New Build 99.9 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
Land North of Clayhill Farm, Westoning, MK45 5JD (9 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land North of Clayhill Farm, Westoning MK45 5JD (6 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (14 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations