Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

[PARENT] SSE plc

231 unique locations (2416 components) - Page 5 of 10

Active MW: 0.00 MW
Inactive MW: 0.00 MW
HAYWARD AVENUE WEST WICK WESTON-SUPER-MARE BS24 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
HIGH STREET WESTONING BEDFORD MK45 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Hillside West, Hutton, Weston-super-Mare, Somerset, BS24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Humbly Grove Energy Ltd, Weston Common, The Avenue, Lasham, The Avenue, Alton Hants, GU34 5SY (1 component)

On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)

Active • 2025-26 (T-1)
Humbly Grove, Weston Common, The Avenue, Lasham, Alton, Hants, GU34 5SY (2 components)

On-site back-up generation which reduces site consumption and exports excess to distribution network

Active • 2027-28 (T-4), 2024-25 (T-1)
Inverary, Argyll, PA36 (1 component)

Hydro genset

Active • 2027-28 (T-4)
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (15 components)
• 1 x hydro turbine & synchronous generator
• 1x hydro turbine & synchronous generator
• Inverawe for 2017/18 only
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Invergarry Power Station, Invergarry, By Fort Augustus, Inverness-shire, PH35 4HL (2 components)

Invergarry Hydro Generation Genset

Active • 2028-29 (T-4), 2027-28 (T-4)
IRONS WAY, WEST WICK, WESTON-SUPER-MARE, BS24 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Kay Weston Newbury Berkshire RG20 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (4 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (53 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Kent Avenue West Wick Weston-Super-Mare BS24 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
KENT AVENUE WEST WICK WESTON-SUPER-MARE BS24 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Kerry Falls Power Station Near Gairloch Wester Ross IV22 2HP (1 component)

Hydro Generation Unit

Active • 2028-29 (T-4)
Kilmorack Power Station, River Beauly, By Beauly, Inverness-shire, IV4 7AL (2 components)

Kilmorack Hydro Generation Gensets 1&2 (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
Lairg Power Station, Loch Shin, Lairg, Sutherland, IV27 4EQ (2 components)

Lairg - 1x hydro turbine and synchronous generator

Active • 2028-29 (T-4), 2027-28 (T-4)
Lakeshill Road, Worcestershire, WR11 8TS (4 components)
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2028-29 (T-4), 2025-26 (T-1)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (14 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land North of Clayhill Farm, Westoning MK45 5JD (6 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations