Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

[PARENT] SSE plc

231 unique locations (2416 components) - Page 6 of 10

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Humbly Grove, Weston Common, The Avenue, Lasham, Alton, Hants, GU34 5SY (2 components)

On-site back-up generation which reduces site consumption and exports excess to distribution network

Active • 2027-28 (T-4), 2024-25 (T-1)
Humbly Grove Energy Ltd, Weston Common, The Avenue, Lasham, The Avenue, Alton Hants, GU34 5SY (1 component)

On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)

Active • 2025-26 (T-1)
Hillside West, Hutton, Weston-super-Mare, Somerset, BS24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
HIGH STREET WESTONING BEDFORD MK45 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
HAYWARD AVENUE WEST WICK WESTON-SUPER-MARE BS24 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
HARINGTON DRIVE WESTON COYNEY STOKE-ON-TRENT STAFFORDSHIRE ST3 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Harington Drive Weston Coyney Stoke-On-Trent Staffordshire ST3 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
HAMERTON ROAD ALCONBURY WESTON HUNTINGDON CAMBRIDGESHIRE PE28 (24 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Grudie Bridge Power Station, Loch Luichart, near Garve, Ross-shire, IV23 2QB (4 components)
• Achanalt - Hydro Generation Genset
• Grudie Bridge Gensets 1 & 2
Active • 2028-29 (T-4), 2027-28 (T-4)
Grove Road Weston-Super-Mare Avon BS22 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Gordonbush Wind Farm, Brora, Sutherland, KW9 6LX (6 components)

Wind Farm with 11 Wind turbines

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Glen Moriston Power Station, Loch Dundreggan, by Fort Augustus, Inverness-shire, IV63 7YH (1 component)

Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.

Inactive • 2021-22 (T-4)
Glen Moriston Power Station, Loch Dundreggan, by Fort Augustus, Inverness-shire, IV3 6YM (5 components)

Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (11 components)
• Gensets 1 & 2
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Livishie Hydro Generation Genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Gaur Power Station, Killiechonan, Bridge of Gaur, Perthshire, PH17 2QB (2 components)

Hydro Generation Unit

Active • 2028-29 (T-4), 2027-28 (T-4)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (14 components)
• Generating Unit 1
• Generating Unit 2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
FORE STREET WESTON HITCHIN HERTFORDSHIRE SG4 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Finlarig Power Station By Killin, Perthshire, FK21 8TX (3 components)
• Hydro Generating Unit
• Hydro Generation Unit
Active • 2028-29 (T-4), 2027-28 (T-4)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (140 components)
• Generating Unit 1
• Generating Unit 1 for Delivery Year 2017/18 only
• Generating Unit 2
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations