[PARENT] SSE plc

28 unique locations (199 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Aldbrough Gas Storage Facility, HU11 4QB (1 component)

Battery Storage

Inactive • 2021-22 (T-4)
Aldbrough Gas Storage Facility, HU11 4QG (1 component)

Battery Storage

Inactive • 2020-21 (T-4)
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8RG (2 components)

1 x hydro turbine & synchronous generator

Inactive • 2017-18 (T-1)
Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8RG (5 components)

1 x hydro turbine & synchronous generator

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Inactive • 2020-21 (T-4)
Coleridge Rd, Weston-super-Mare BS23 3UW (8 components)

Diesel and/or gas reciprocating engines.

[PARENT] SSE plc Not Prequalified BS23
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Court North Lane Weston-On-The-Green BICESTER OXFORDSHIRE OX25 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Deanie Power Station, Struy, By Cannich, Inverness-shire, IV4 7JX (14 components)
• Deanie Unit 1
• Deanie Unit 1 FOR 2017/18 Delivery Year only
• Deanie Unit 2
• ... and 1 more unique description
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5DF (19 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Fasnaykyle Power Station, Cannich, Inverness-shire, IV4 7NB (20 components)
• Generating Unit 1 for Delivery Year 2017/18 only
• Generating Unit 2 for Delivery Year 2017/18 only
• Generating unit 3. For Delivery Year 2017/18 only.
• ... and 2 more unique descriptions
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (14 components)
• Generating Unit 1
• Generating Unit 2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Glen Moriston Power Station, Loch Dundreggan, by Fort Augustus, Inverness-shire, IV3 6YM (5 components)

Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Glen Moriston Power Station, Loch Dundreggan, by Fort Augustus, Inverness-shire, IV63 7YH (1 component)

Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.

Inactive • 2021-22 (T-4)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (4 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land off Main Road, Weston, CW2 5LD (3 components)
• 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lochay Power Station, Killin, Perthshire, FK21 8UA (8 components)
• Post-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
• Pre-refurbishment generating unit. ROCable hydro units within the BMU are not included in the CMU.
• ROCable hydro units within the BMU are not included in the CMU. For Delivery Year 2017/18 only.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Luichart Power Station, by Loch Luichart, Contin, Ross-shire, IV14 9EW (5 components)

ROCable hydro units within the BMU are not included in the CMU.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
PLESHEY CLOSE WESTON-SUPER-MARE BS22 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (18 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
St Andrews Road, Kings Weston Lane BS11 9FG (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...