Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

[PARENT] Velox Power Limited

9 unique locations (25 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
7 Tartraven Place, Broxburn, West Lothian EH52 5LT (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bankside Industrial Estate, Middlefield, Glensburgh, Falkirk FK2 7XU (2 components)

The facility consists of a 19.9MW gas facility.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
By 7 Tartraven Place, Broxburn, West Lothian. EH52 5LT (2 components)

Reciprocating Gas Engines (5 x 2MW) to be installed on designated land in the East Mains industrial estate.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH. This site PQ'd last year as CCBS15 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN's network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (6 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Lower Dunton Road, Laindon, Basildon, Thurrock, East of England, England, SS16 6EB (1 component)

Ten unit c.21MW generating station, transformer(s), gas kiosk, DNO switchroom and associated infrastructure.

Inactive • 2022-23 (T-3)
Mucklow Hill, Dudley, West Midlands Combined Authority, West Midlands, B62 8DL (7 components)
• A series of gas powered reciprocating engines, gas kiosk, DNO switchroom and associated infrastructure
• New build gas generator
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Stourton Estates, Hatton, LN8 5QL (1 component)

As indicated this CMU is linked to EDP112. EDP112 gained a T-4 CM contract in the CM16 auction. This CMU application enables a separate portion of a new build gas …

Inactive • 2022-23 (T-4)
Loading map...
Showing 9 locations