ADD Renewables Limited

3 unique locations (42 components)

Active MW: 0.00 MW
Inactive MW: 65.75 MW
FALCON DRIVE NEWTON MEARNS GLASGOW G77 (2 components)
• Bootle CMU Outlined in asscociated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2018-19 (T-4)
LD3 (38 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
ROBIN CLOSE OLLERTON NEWARK NOTTINGHAMSHIRE NG22 (2 components)
• Barnsley CMU Outlined in associated Construction Plan Bootle and Barnsley Output metered net of Station Load - no separate metered auxiliary exists
• Existing CCGT
Active • 2028-29 (T-4), 2018-19 (T-4)