ALKANE ENERGY UK LIMITED

211 unique locations (1691 components) - Page 7 of 9

Active MW: 171.93 MW
Inactive MW: 772.22 MW
SUBSTATION 2, LITTLEBROOK BATTERY STORAGE, ALBION ROAD, DARTFORD, KENT, DA1 5PZ (8 components)
• 4MW of DSR
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (34 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (5 components)
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (6 components)
• 3.6MW of demand reduction
• Gas generating unit(s)
• NEW BUILD GAS GENERATION STATION
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (5 components)
• 1x MWM TCG 2020
• Gas fired generating unit
• Gas reciprocating engine
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (6 components)
• 1x MWM TCG 2020
• Gas fired generating unit
• The CMU component is an aggregation of turn-down and onsite generation
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Gas reciprocating engines.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• gas generation
Inactive • 2021-22 (T-4)
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FT (5 components)
• 1 x MWM TBG 620V 16K
• Gas reciprocating engine
• Unit 3 at Saltend Power Station
Inactive • 2021-22 (T-4), 2017-18 (T-1)
Toray 3 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas reciprocating engines
• Water treatment centre
Active • 2024-25 (T-1), 2021-22 (T-4)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (4 components)
• Gas fired generating unit
• Gas generating unit(s)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...