Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

2408 unique locations (57912 components) - Page 37 of 97

Active MW: 260.05 MW
Inactive MW: 13.73 MW
HR3 (12 components)

Domestic EV charger

Inactive •
3.52 MW
HR4 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
7.38 MW
HR5 (6 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
3.52 MW
HR6 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
7.39 MW
HR7 (3 components)

Domestic EV charger

Inactive •
3.55 MW
HR8 (36 components)

Domestic EV charger

Inactive •
14.98 MW
HR9 (33 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
8.22 MW
HS3 (4 components)

Domestic EV charger

Inactive •
3.52 MW
HS8 (2 components)

Domestic EV charger

Inactive •
3.52 MW
HU1 (1 component)

Domestic EV charger

Inactive •
HU10 (38 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.01 MW
HU11 (15 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Inactive •
3.55 MW
HU12 (29 components)

Domestic EV charger

Inactive •
4.48 MW
HU13 (32 components)
• Domestic EV charger
• Domestic demand turn down
Inactive •
7.39 MW
HU14 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Inactive •
7.59 MW
HU15 (28 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.01 MW
HU16 (13 components)

Domestic EV charger (2)

Inactive •
0.03 MW
HU17 (50 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
19.46 MW
HU18 (4 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
4.48 MW
HU3 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Inactive •
14.98 MW
HU4 (6 components)

Domestic EV charger

Inactive •
3.52 MW
HU5 (7 components)

Domestic EV charger

Inactive •
3.52 MW
HU6 (4 components)

Domestic EV charger

Inactive •
7.39 MW
HU7 (38 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.01 MW
HU8 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Inactive •
38.30 MW
Loading map...
Showing 25 locations