Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BEECHGREEN ENERGYFARM LIMITED

6 unique locations (282 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
CW11 (128 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.54 MW
FY4 (46 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.54 MW
MORLEY ROAD OAKWOOD DERBY DE21 (4 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• Domestic EV charger
• Output metered net of Station Load - no separate metered auxiliary exists
Active • 2025-26 (T-1), 2018-19 (T-4) ...
2.74 MW
RG26 (98 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.49 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (5 components)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
WOODLANDS PARK BATH BA1 (1 component)

Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.

Active • 2025-26 (T-1)
2.74 MW
Loading map...
Showing 6 locations