BESS Claredown Limited

1 unique locations (1 components)

Active MW: 207.73 MW
Inactive MW: 331.51 MW
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 component)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Inactive • 2022-23 (T-4)